A 1x240kW DC charging station infrastructure was installed at Şişli Etfal Training and Research Hospital, delivered in full compliance with the technical specifications of the Ministry of Health.
Project Scope and Requirements
Infrastructure projects at Ministry of Health training and research hospitals must comply not only with standard engineering practice but also with technical specifications specific to public institutions. At Şişli Etfal Training and Research Hospital, the goal was to bring a 240kW DC charging load -- higher than the other hospital projects -- online in full compliance with those specifications.
Technical Solution Implemented
The project was engineered against the relevant Ministry of Health technical specification. The 240kW DC charging station infrastructure was integrated into the hospital's electrical system with equipment selection, protective devices, and field installation matched to that specification, then handed over.
Results and Benefits
Delivered in full compliance with the technical specification, this project has given Şişli Etfal Training and Research Hospital a high-capacity, fully compliant DC charging infrastructure. This approach shows how technical compliance can streamline inspection and acceptance processes on public healthcare projects.